Rubber factory
Jump to navigation
Jump to search
Cost | $325, 2,500x wood, 100x steel |
Total Cost | $1500 |
Inputs | 8x crude oil |
Outputs | 1x rubber |
Production interval | 40 seconds |
Production/Hour | 90x rubber |
Profit/Min | $9.3 |
Profit/Hour | $558 |
Return On Investment | 0.62% |
Time to ROI | 161.29 Minutes (~2:30 hours) |
Aliases | rubber factory, rubberfactory, rubber plant, rubberplant, rubber fac |
The rubber factory is a facility that produces 1x rubber every 40 seconds.
You need the output of 1/5 of an Oil well to fully sustain this. In other words, You can run 5 rubber factory from 1 Oil well
Related facilities
As construction material
- Gas station
- Aluminum factory
- Bicycle factory
- Lamp factory
- Plastic factory
- Research chemical factory
- Television factory
- Gasoline engine factory
- Car factory
- Prescription drug factory
As input