Car factory
Jump to navigation
Jump to search
Cost | $6,750,000, 100,000x steel, 10,000x rubber, 3,000x furniture, 1,000x laptop |
Total Cost | $10,000,000 |
Inputs | 1x CPU, 40x steel, 30x rubber, 1,000x plastic, 28x glass, 1x gasoline engine |
Outputs | 1x car |
Production interval | 10 minutes |
Production/Hour | 6x car |
Profit/Min | $2,000.00 |
Profit/Hour | $120,000.00 |
Return On Investment/Min | 0.013% |
Time to ROI | 7,733.92 Minutes (~5 days and 8 hours) |
aliases | car factory, carfactory, car fac |
The car factory is a facility that produces 1x car every 10 minutes. It is the third slowest facility, only losing to the retail store and truck factory.