Difference between revisions of "Air traffic control"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
|  (added air traffic control) | |||
| Line 7: | Line 7: | ||
| |- | |- | ||
| |'''Production interval''' || N/A | |'''Production interval''' || N/A | ||
| + | |- | ||
| + | |'''Aliases'''||air traffic control, air traffic control tower,<br/> atc, atc tower, airtrafficcontrol | ||
| |} | |} | ||
| [[Category:Facility]] | [[Category:Facility]] | ||
| The air traffic control is a facility created in the [[Updates_log#.2875.29_0d3170e|1.9.4 Update]]. It allows for [[airport]] to be built. Only one air traffic control is needed for the entire corporation. | The air traffic control is a facility created in the [[Updates_log#.2875.29_0d3170e|1.9.4 Update]]. It allows for [[airport]] to be built. Only one air traffic control is needed for the entire corporation. | ||
Latest revision as of 13:55, 20 March 2021
| Cost | $28,480,000, 50,000x steel, 1x airport tram, 200,000x glass, 2,000x furniture | 
| Inputs | N/A | 
| Outputs | N/A | 
| Production interval | N/A | 
| Aliases | air traffic control, air traffic control tower, atc, atc tower, airtrafficcontrol | 
The air traffic control is a facility created in the 1.9.4 Update. It allows for airport to be built. Only one air traffic control is needed for the entire corporation.
